Documenting Seattle's Next Infrastructure Upgrade

New 520 Finance Plan


Posted by Frank on January 23 2008

This is the plan for tolling the 520 and I-90 bridges, with scenarios including pre-construction tolling (i.e. tolling the existing bridge between 2009 and 2018).

Type:
PDF
Tags




User login