Wilburton Tunnel Comes Down
WSDOT crews knocked down the Wilburton Tunnel this weekend. The tunnel is coming down as part of the I-405 South Bellevue Widening Project. With the tunnel gone, the 42-mile Eastside Rail corridor will be officially severed in two. Nevertheless, the PSRC is still moving forward with a second study on using the corridor for commuter rail.
Photo from WSDOT used under a Creative Commons license.
- Frank's blog
- Login or register to post comments
Tags


Dear God, let it stop. That was not a tunnel. That was a railroad bridge over a highway. I don't know when people started calling it a tunnel, but it certainly wasn't in the first ten years it existed.
I'm inclined to think the state DOT started calling it a tunnel so people who didn't know what it was would visualize some kind of improvement when they tore it down.