GNP and Eastside Rail
The Everett Herald is intrigued:
GNP has put together what appears to be a solid business plan that includes paying for upgrading the existing tracks; constructing bare-bones passenger stations in Snohomish, Maltby, Woodinville, Kirkland and Bellevue; building a paved pedestrian/bike trail alongside, and running six trains south in the morning and six more north in the afternoon. Payne says he could have trains, with used locomotives pulling double-decker passenger cars, running as soon as next year. Acting alone, the public sector can only dream about moving that quickly.
Speaking of quick, the ride from Snohomish to Bellevue would take just 32 minutes. Try doing that in your car during rush hour.
- Frank's blog
- Login or register to post comments
